Restoration of The Falcon Inn (Northampton)
Restoration of The Falcon Inn (Northampton) Another example of the very quick and cost effective WAKOL system. A customer of NWF Wandsworth wanted to get moving quickly on a commercial restoration job (the floors in The Falcon Inn) and consulted […]
The Lalit Hotel: something different (London)
This project was quite unusual as the client needed to lift the original pine parquet block, create a new low tension sub floor and then refit the old floor as detailed by the architect. Campbell contracts, with the help of Lecol decided to use a unique system that met with everyone's expectations.
Starbucks floor as new (Manchester)
This project was completed by one of our contractors at Starbucks in Manchester. They were able to gain access to the shop from 9pm when it closed, then sanded and refinished the floor using LOBASOL® 2K ImpactOil Transparent, before the shop re-opened at 6am the following morning.
LIVE DEMONSTRATION (SOUTHAMPTON)
Another on site demonstration was completed in a Southampton Hotel. The contractor wanted to retain the natural look of the existing oak boards and so LOBADUR® 2K InvisibleProtect AT seemed the logical option. Following the successful demonstration, 160 m2 of oak flooring was finished with 2 coats