Simplify wood flooring installation with the WAKOL Flow Chart

At Lecol UK, we know that installing a wood floor can sometimes feel overwhelming. From checking moisture levels to deciding which adhesive or primer to use, every step plays an important role in the long-term performance of your floor.

That’s why we created the WAKOL Wood Flooring Installation Flow Chart, a practical guide that takes you through the process in just four clear steps.

What the Flow Chart covers

Our flow chart is designed to make life easier for flooring professionals and installers. It helps you:

  • Identify your subfloor type: including checking for moisture risk, old bitumen, or the absence of a physical DPM.
  • Assess moisture levels: ensuring your testing methods comply with British Standards (65% RH or below).
  • Decide on levelling: quickly see whether a levelling compound is required before installation.
  • Select the right primer and adhesive: with product recommendations such as WAKOL MS 330 Silane Primer, WAKOL PU 280 Polyurethane Primer, and a full range of WAKOL parquet adhesives.

Why we made this

As specialists in adhesives and installation systems, we at Lecol UK are committed to supporting flooring professionals with the right tools, knowledge, and products. The flow chart is just one of the ways we aim to simplify the decision-making process and give you confidence on site.

Download the Flow Chart

Ready to streamline your next wood flooring project?

SHARE